INTRODUCTION
It is significant to create a BIM Execution Plan (BEP) before the onset of a construction project. This helps to analyze the different phases of the building project lifecycle. As a comprehensive documentation, BEP facilitates project team members to execute the role played by BIM (Building Information Modeling) in construction management.
It is often found during a building construction project that building execution gets buried in mundane aspects, making it hard to identify significant data to move forward with the projects and produce timely deliverables. An accurate BEP facilitates keeping track of the project teams, emphasizing the significant aspects, and saving time and money.
What is BEP in Revit?
BIM consultants are developing BIM BEP in Revit to facilitate information management in construction projects. An effective BIM execution plan template helps to streamline the process of BIM Modeling and BIM resource planning. Competent BEP in Revit leads to accurate BIM-based design collaboration through preliminary design model (BIM LOD 100), detailed design model (LOD 200), construction design model (BIM LOD 300), and prefabrication model (LOD 400).
Here is the technique of the BIM implementation plan for architectural, engineering, and MEP services.
- Technology Selection
- Identifying Software & Data Exchange Protocol
- Choosing a Network Environment
2. Establishing Project Scope
- Identifying Stakeholders, BIM Staffing, Training Capability & Target Model Users
- Setting Up BIM Collaboration Goal
- Initiating BIM Projects
3. Setting Up Modeling Standards
- Establishing Modeling Standards
- Resolving Intellectual Property Issues
- Initiating BIM Team Communication Protocol
Top 7 Benefits of BIM execution plan in a construction project:
💢 Clear Communication: A proper BIM BEP supports communication amongst project stakeholders from the onset of the construction project. This facilitates project team members to manage responsibilities and ensure clear communications about the project.
💢 Improved Collaboration: Each project is different from the others and has diverse requirements, regulations as well as internal standards. A BIM execution plan helps the project team members collaborate in real time on different project phases, preventing conflicts among project tasks and allowing proper attention to the significant tasks.
💢 Saving Construction Time: An obstacle that often arrives in a construction project is a compressed schedule. A well structured BEP emphasizes the benefits of the project. None is bogged down with the provisions that may cause delays to the project deliverables. As an alternative, the vital aspects are executed, maintaining a deliverable schedule throughout the project.
💢 Saving Money: BIM BEP helps to save money, and help to finish the construction within budget. It helps owners and building contractors significantly. With the help of managing time, schedule, and labor, BIM execution plan for contractors can significantly cut down the cost of building construction.
💢 Alignment on standards: Identifying that different regions may have distinct norms, standards, or regulations is especially significant for large or international projects. It is possible for international teams to work together using a unified strategy provided by the BIM execution plan, avoiding the development of incompatible and competing strategies.
💢 Fast Data Sharing: Transparency is a great advantage of the BIM execution plan, as it is instantly available to all the project stakeholders from the very beginning of the construction project. As a result of which, contractors, owners, and others get direct access to BIM data like file formats, dimensions, and other details in a way that could be easily shared and updated.
💢 Robust Project Execution: An effective BIM Execution Plan focuses on the project rather than every standard. Construction team members are able to communicate and collaborate better from the initial stage, ensuring a robust project execution, and facilitating all the project owners and shareholders. Accomplishing this plan helps to keep the building items accountable, ensuring completion on time and as per budget.
Conclusion
The primary goal of creating a detailed BIM execution plan is to encourage and coordinate building project team communication and planning. While there may not be a single best practice for incorporating BIM into a construction project, teams working on such projects would do well to design or employ a strategy that takes into account the specific objectives, characteristics, and resources of their project.
Tejjy Inc is one of the Top BIM service providers in USA, delivering the right guide to BIM execution plans for residential, commercial, infrastructural, educational, and mixed use projects. Leveraging a BIM execution plan, AEC team members could start any major construction project, ensuring proper communication among stakeholders and fast data sharing. So, if you want stronger project execution, improved timelines, and happy project owners, contact Tejjy Inc. BIM consultants at 202-465-4830 or info@tejjy.com.
Along with the BIM execution plan, Tejjy Inc. BIM engineers are competent in delivering other BIM consulting services like BIM strategy preparation, BIM deployment and resource sharing, logistics planning, and BIM infrastructure planning. Appoint the Tejjy Inc BIM outsourcing company in USA and execute your BIM project in an effective way, saving time and money for your construction.