MEP BIM Services in New York City – Clash-Free, Code-Compliant, Contractor-Focused
Tejjy BIM lifecycle process support projects from planning to operations. Our Architectural, Structural and MEP BIM consultation services in NYC includes clash coordination, precise Revit Model (LOD 100 – 500), 4D/5D Scheduling, shop drawing with code compliance.
- BIM Coordination: Proactive clash resolution, optimal routing, and constructability review using Revit, Navisworks, and BIM 360.
- 3D Laser Scanning & Scan-to-BIM: Laser-accurate digital capture and rapid as-built modeling for renovations, adaptive reuse, and compliance.
- MEP Shop Drawings & Fabrication: LOD 400/500 deliverables, prefabrication support, and seamless BIM-to-field integration.
- Sustainability & Lifecycle Analytics: Energy modeling, system efficiency, and data-driven building performance reports for green certifications.
BIM Modeling Services For NYC : Design To Facilities
End-to-End BIM Services in New York City
- Design Development (LOD 100–300)
Early BIM modeling for conceptual and schematic design, including clash detection and New York City DOB code compliance checks. - Construction & Fabrication (LOD 350–400)
Production of shop drawings, spool sheets, and quantity take-offs, supported by 4D scheduling and 5D cost simulations to meet NYC’s demanding construction timelines. - As-Built & Handover (LOD 500)
Accurate Scan-to-BIM for existing buildings, delivery of final as-built BIM models, and digital twins for lifecycle-ready turnover. - Operations & Maintenance
Integration of BIM data with facility management systems, supporting retrofits, renovations, and asset management across NYC’s commercial towers, healthcare facilities, and infrastructure projects.
Point Cloud to BIM Modeling Services in New York
NYC BIM Modeling & Coordination with LOD(200-500) Services for
- Data Centre
- Commercial
- Healthcare
- Industrial
- Education
- Airports & Transits
- Heritage & Mueseums
- Hotels & Retail
- Warehouse
- Residential
- Oil & Gas
- Water Treatment
- EV Charging
- Infrastructure
- Federal & Public
- Telecom
- Utilities & Energy
- Entertainment Venues
- Roads & Bridges
- Defense
- Manufacturing Plants
- Real Estate
- Auditoriums & Centers
- Mixed Use
Major Challenges for MEP Contractors in NYC & How We Help
| Challenge | Solution with Tejjy |
|---|---|
| Tight Urban Spaces & Existing Structures - Retrofit jobs in Manhattan often require coordination around confined shafts, hidden utilities, historic facades. | We perform scan-to-BIM, precise spatial coordination, prefabrication of spools to reduce field disruptions. |
| Strict Local Codes & Review Bottlenecks - Electrical, fire protection, plumbing standards, NYC energy & sustainability codes; delays from DOB reviews. | We ensure models & drawings adhere to NYC code; we help prepare submission-ready documentation. |
| Inter-Trade Conflicts - HVAC ducts running into structural elements, plumbing routing interfering with electrical or architecture, etc. | Early coordination sessions using shared BIM platforms; clash detection; conflict reports; coordination meetings. |
| Fast Turnaround / Tight Deadlines - Accelerated project schedules and overlapping trade workflows in NYC demand rapid BIM coordination and on-site execution. | We offer scalable teams and use BIM tools/libraries optimized for speed; have standard LOD packages; streamlined review feedback loops. |
| Cost Overruns / Waste - Frequent design revisions, material mismanagement, and uncoordinated installations often lead to budget escalations and resource waste. | Accurate BOM, value engineering, material optimization, prefabrication to reduce labor & site waste. |
Get In Touch
Ready to transform your project with
digital precision?
Phone
(202) 465-4830
Email
info@tejjy.com
Service Areas
New York, Florida, Ohio, Virginia, Maryland & Beyond
Response Time
Within 24 hours
Got Questions? We have modeled the answers
NYC BIM requirements usually depend on the project stage and the approval authority:
- LOD 200–300 for early design and feasibility
- LOD 300–350 for DOB submissions and coordinated design packages
- LOD 350–400 for construction coordination, clash detection, and fabrication
- LOD 500 for as-built turnovers and facility management
Most NYC contractors prefer LOD 350/400 MEP coordination to avoid clashes in tight mechanical rooms, shafts, and utility corridors, a common challenge in both high-rise and brownstone projects.
BIM is one of the most effective tools for achieving Local Law 97 (LL97) compliance because it allows teams to:
- Simulate energy performance to evaluate emissions reduction strategies
- Model and analyze HVAC upgrades, insulation, glazing changes, and electrification paths
- Identify energy-intensive zones using real-time data
- Support carbon forecasting and lifecycle analysis
- Create digital twins for ongoing energy monitoring
By visualizing existing conditions and testing multiple retrofit scenarios, BIM enables building owners to choose the most cost-effective pathway to meet New York City’s LL97 carbon emissions caps.
NYC BIM requirements usually depend on the project stage and the approval authority:
- LOD 200–300 for early design and feasibility
- LOD 300–350 for DOB submissions and coordinated design packages
- LOD 350–400 for construction coordination, clash detection, and fabrication
- LOD 500 for as-built turnovers and facility management
Most NYC contractors prefer LOD 350/400 MEP coordination to avoid clashes in tight mechanical rooms, shafts, and utility corridors, a common challenge in both high-rise and brownstone projects.
While BIM is not legally mandated, BIM Services New York have become essential for Manhattan high-rise construction. The density of vertical MEP systems, complex structural cores, façade integration needs, and strict compliance requirements make BIM the preferred approach for:
- Reducing on-site clashes
- Coordinating trades within tight vertical shafts
- Managing aggressive, fast-track construction schedules
- Supporting DOB and FDNY documentation and approvals
- Enhancing construction sequencing through 4D BIM
- Enhancing construction sequencing through 4D BIM
Today, most major developers, general contractors, and engineering firms in Manhattan consider BIM Services New York a standard requirement for delivering high-rise projects efficiently and safely.
BIM adoption in NYC is strong across multiple sectors, especially:
- Commercial and corporate real estate
- High-rise residential and mixed-use towers
- Hospitals and healthcare facilities
- Retail and hospitality
- Transportation and infrastructure
- Cultural, educational, and institutional buildings
- Landmark and historic preservation projects
Due to the city’s density, coordination-heavy construction, and strict sustainability rules, BIM has become a critical part of project delivery across the five boroughs.