3D Laser Scan To As-Built Modeling For Office Building in MD,USA

as-built documentation services for Front Royal Veterinary Clinic

Project Overview

Client Profile

Wida Gharshat

Location

Office building in MD

Industry

Commercial (Retail)

Inputs

Site and work details

Deliverables

Laser scanned data and as-built model

SOFTWARE WE USED
Project Samples
high resolution reality capture of existing conditions
High Resolution Reality Capture of Existing Conditions
Tejjy successfully delivered 3D laser scanning services
3D Laser Scanning to As-Built BIM Model in Maryland, USA
Business Needs

The primary requirement was about a comprehensive as-built for architectural interior model of office building to facilitate future restoration work. To execute the vision, client sought for precise spatial documentation and design data.  

Challenges

As the facility was an office setup, therefore Tejjy’s workforce encountered various challenges associated with workplace typology –  

  • The project required precise, comprehensive as-built data to ensure proper refurbishment planning and design flexibility. 
  • For a consistency with project communication, a real-time project review system was established with digital tools. 
  • Converting a large amount of acquired scanned data into CAD/BIM for an optimal set of facility management operations ahead.  
  • The project’s success also relied on maintaining model data quality and consistency throughout.

Outsource your As-built & 3d laser scanning requirements to us

Our Solutions & Approach

Tejjy used a Leica 3D laser scanner to accurately capture the site conditions, which was then utilized to develop the digital model in Revit and AutoCAD formats.

  • We used Leica RTC 360 scanner for high-resolution 3D scanning for enhancing documentation precision with 360-imaging and high-density point cloud data. 
  • Tejjy’s team involved a waterfall methodology for work execution for pre-project planning, on-site scanning, and final data integration. 
  • The very final workings involved rigorously monitoring as-built CAD/BIM models development process for long-term data management. 
Business Impact

The laser scanning approach taken by Tejjy helped in reduction of manual errors and semless integration of scan data with CAD/BIM workflow. This further resulted in greater operational efficiency for renovation ops with adherence to deadlines and standards. 

Complete your construction project on-time & within budget

Share:

Subscribe to our newsletter to get latest updates