Fully Integrated Mechanical, Electrical, Plumbing, Fire Protection Coordination
Our MEP coordination services encompass HVAC Mechanical, Electrical, Plumbing and Fire protection integration into single 3D model. coordination services tailored to your MEPF requirements. Tejjy MEP modelers are experienced in Autodesk Revit, ArchiCAD, AutoCAD MEP, and Navisworks, for clash resolution and coordination.
At Tejjy, we bring all project stakeholders, including engineers, project managers, and the construction workforce, together for effective project communication.
We work around thorough model audit for soft and hard clashes . Alongside manual verification checks on HVAC, power, and plumbing systems are conducted for quality assurance. This ensures clash-free MEP model as per US standards.
Our MEP coordination services cater to diverse project requirements. From detailed coordination drawings, plans, elevation, sections, Revit 3d model , as-built for MEP power supply, cooling, dry and wet utilities to leak detection.

Our MEP Coordination Service Offerings
Our MEPFP Coordination Process
MEP Coordination Process is a vital aspect of ensuring building safety, functionality, and cost-effectiveness. It spans from concept to close-out, encompassing the following stages:

- Design Phase: MEPFP designers create detailed mechanical, electrical, plumbing , fire protection designs tailored to project requirements and constraints.
- Coordination Phase: MEP coordinators meticulously review designs to ensure seamless integration and identify and resolve any conflicts or issues.
- Construction Phase: MEP contractors execute installations while closely monitoring integration with the design.
- Commissioning Phase: MEP coordinators conduct tests and inspections to verify systems’ correct operation according to MEP standards.
- Handover Phase: Upon project completion, systems are handed over to the owner with comprehensive training on operation and maintenance.
OUR EXPERTISE IN
Case Studies

Our renovation project at 29 W. Lexington Street in Baltimore, MD, focused on modernizing utility systems while preserving historical significance. Using BLK 360 3D Laser Scanner, 32 scans were conducted, resulting in a Level of Development 500 MEPF BIM model. This ensured accurate site coordination and construction alignment. Services included shop drawings, coordination design for MEPF systems, clash detection, and family creation. The outcome was a detailed BIM model facilitating precise renovation coordination.
Showcasing Our Projects in MEP BIM Coordination
Why 3D MEP Coordinated Drawings Critical for MEP Contractors?
- Enable early clash detection to avoid costly on-site conflicts.
- Provide precise quantity take-offs for accurate material estimation.
- Support faster off-site fabrication and streamlined on-site assembly.
- Improve construction scheduling with better trade coordination.
- Reduce RFIs and minimize change orders during execution.
- Enhance field team productivity with clear, constructible drawings.
- Ensure code compliance and clearance accuracy from the start.