As-Built MEPF BIM For Defense Infrastructure in US

Project Overview

Client Profile

US Federal Government

Industry

Government Renovation

Deliverables

As-Built, MEPF Model Coordination, and Shop Drawing

As-Built & MEPF BIM Services for Naval Yard Project USA
Business Needs
  • Comprehensive scan to as-built documentation for the Federal facility existing conditions to serve as a baseline for design and construction. 
  • An efficient MEPF design system to integrate seamlessly with the operational infrastructure for DC, USA, ensuring minimal disruption to ongoing activities. 
  • Develop construction-ready shop drawings to address the unique challenges posed by wetland conditions and ensure structural stability. 
Challenges

DC Naval shipyard’s location in a wetland zone, reflecting environmental concern.

  • Our primary concern was designing a robust foundation capable of supporting heavy naval infrastructure in these conditions. 
  • The naval facility’s role in supporting various operations demanded a well-coordinated MEPF system. 
  • Proximity to coastal areas required adherence to strict environmental regulations. 
Project Samples
As built services for MEPF in DC, USA
Sustainable As-Built and MEPF Design Excellence For Fedral Project
MEPF As built Coordination Model in DC |Tejjy
Advanced BIM Solutions for DC Naval Yard Project
Tejjy Building Information 3D Modeling Company in DC

LOD 350 MEPF BIM modeling for government construction

Looking for As-Built MEPF BIM Modeling for Infrastructure BIM

Our Solutions & Approach

The DC Naval Yard project highlights Tejjy Inc.’s expertise in handling complex federal projects. Through innovative solutions, advanced BIM workflows, and a commitment to sustainability, Tejjy delivered results that showcased how effective digitized AEC workflow can ensure both operational efficiency and environmental responsibility.

Tejjy Inc. adopted a comprehensive and digitally innovative approach to address the project’s challenges and to deliver solutions adhering to the needs of the government. The workflow included-

  • Creating and delivering detailed pile foundation shop drawings.
  • The design proposed minimized settlement risks and provided long-term durability for the naval yard’s heavy infrastructure. 
  • Level of Development LOD 350 BIM model for the MEPF systems using Autodesk Revit 2024 and Navisworks. 
  • Precise clash coordination for federal military renovation facility among various disciplines.
  • Worked closely with environmental consultants to incorporate measures that preserved the nearby marine ecosystem. 
  • Proactively addressed federal compliance requirements, ensuring the project adhered to all necessary guidelines related to coastal and wetland construction. 

Digital Modeling FAQ

How does the use of As-Built MEP BIM models improve long-term facility management at DC Naval Yard?

The detailed as-built BIM models for facility MEP system serves as a dynamic digital record. This will support efficient planning, facilitating future renovations or upgrades to ensure continuous operational efficency.

How was structural stability addressed by Tejjy given the wetland conditions?

Tejjy Inc. developed detailed documentation of pile foundation system engineered for stability of wetland soil. This ensured long-term structural integrity and minimized risks related to settlement.

What measures were taken for environmental compliance?

The project integrated sustainability and environmental preservation measures by working closely with ecological consultants. We ensured MEPF system design and construction protected the nearby marine ecosystem.

How does Tejjy Inc. manage change documentation in the as-built models?

Our workflows include tracking and integrtion of all field changes and shop drawing revisions. This is to ensure the final BIM model reflects the precisely constructed state. A transparent workflow at Tejjy Inc. even allows us to deliver reliable BIM solutions for complex project.

Why is Tejjy Inc a trusted partner for federal infrastructure projects requiring MEP BIM services?

With extensive experience in federal environments for complex infrastructural projects, Tejjy Inc. is chosen by government agencies and contractors. We combine technical expertise, BIM execution workflow as per standard, and environmental responsibility. This project exemplifies their ability to deliver precise digital modeling solutions for government wetland construction.

What technical data is included in the as-built BIM model for MEP sytem?

The components of MEP BIM model contain dimensions, materials, routing paths for pipes, ducts and cables, connection details, pressure and flow rates, manufacturer specifications, installation dates, access points for maintenance and operations.

Share:

Subscribe to our newsletter to get latest updates

error: Content is protected !!