Case Study - 3D Modeling & MEP Coordination Services for Brunswick School in Connecticut

Project Overview

Client Profile

A&B Mechanical

Industry

Educational Facility

Deliverables

3D Modeling (Mechanical & Plumbing), Coordination, Shop Drawings

MEP Drawings & 3D Modeling Services for Institution in Connecticut
Project Samples
BIM-Driven 3D Modeling & MEP Coordination for School, CT
3D MEP BIM Modeling for Brunswick School, CT
Clash-free MEP 3D model of educational facility Brunswick School,CT
MEP Clash Coordination & 3D Modeling for Educational Facility, Greenwich, Connecticut
3D modeling and MEP coordination for Connecticut, U.S
3D MEP BIM Modeling for Brunswick School, CT
Revit 3D BIM modeling of MEP system
Business Needs

Tejjy delivered precise 3D modeling and MEP coordination services for Brunswick School in Greenwich, CT. With Revit and Naviswork at the core of our workflow, ensure mechanical and plumbing 3D modeling, coordination, and shop drawings. Given the complexity of MEP coordination in an educational facility, the project demanded a clash-free and well-integrated design. Tejjy Inc. In collaboration with A&B Mechanical was chosen for its expertise in BIM-driven MEP coordination. Our proven experience in delivering high-quality MEP BIM models and shop drawings that optimized efficiency in fabrication and installation, positioned us as the perfect partner for this project.  

Key Objectives: 

  • Develop an accurate 3D model for mechanical and plumbing systems, ensuring alignment with architectural and structural designs. 
  • Perform clash detection and resolution to eliminate potential conflicts before construction. 
  • Generate precise shop drawings to facilitate smooth fabrication and installation. 
  • Improve communication and coordination among stakeholders through a centralized BIM workflow. 
Challenges
  • The educational project came with tight constraints- complex ceiling shafts, overlapping electrical and fire systems, and active operations on site. Our team overcame these by using spatial modeling to optimize MEP layouts. This ensured seamless upkeep of accessibility, alignment and stakeholder coherence across architectural and structural teams.

Outsource your MEP BIM Modeling Services Requirements to Us

Our Solutions & Approach

The Brunswick School project highlights Tejjy Inc.'s expertise in BIM-based MEP coordination, ensuring a well-integrated and error-free mechanical and plumbing system. Our team utilized Revit 2022 for detailed 3D modeling and Navisworks for clash detection, proactively resolving conflicts before installation. By producing precise, fabrication-ready shop drawings, we helped streamline the workflow for A&B Mechanical, ensuring accuracy in system installation and reducing rework on-site.

To address these challenges, we implemented a technology-driven, collaborative approach: 

Comprehensive 3D Modeling: Created detailed mechanical and plumbing models using Revit 2022, ensuring all elements were spatially coordinated. 

  • Tejjy Inc. Deployed clash detection and resolution using Navisworks to detect and resolve clashes with structural, electrical, and fire protection systems before fabrication. 
  • With out expert space optimization strategies our team conducted model-based spatial analysis to fit systems within ceiling voids and shafts efficiently. The mechanical and plumbing BIM models were crafted in Autodesk Revit 2022 
  • Fabrication-Ready Shop Drawings: We produced detailed, trade-specific shop drawings, which were fabrication ready. Our Mechanical and plumbing shop drawings ensured seamless prefabrication and field installation. 
  • We enabled real-time coordination using a BIM-driven workflow, reducing RFIs and project delays. 

Complete your construction project on-time & within budget

What exactly was Tejjy's role for Brunswick school, CT?

We provide mechanical & plumbing 3D modeling, clash detection and shop drawings in a BIM workflow using Revit and Navisworks.

What softwares are used?

We use Autodesk Revit for detailed modeling and Navisworks for clash detection.

Why is clash-free coordination critical for educational facilities?

Educational facilities have tight ceiling spaces and multiple trade interactions. Clash detection ensures ducts, pipes and cables don’t overlap, preventing costly rework and delays.

Share:

Subscribe to our newsletter to get latest updates

error: Content is protected !!