4D BIM Building Information Modeling adds time into 3D Modeling for construction projects. Tejjy dimension integration extends scheduling, activity sequencing, and construction phasing into the federated model.
Our 4D BIM workflow in construction facilitates critical path method (CPM) schedules or Primavera/MS Project data with the 3D geometry. 4D BIM enables the generation of time-based simulations that visually represent the progression of construction activities across defined intervals.
The Tejjy team helps project teams check construction sequences. They find and fix spatial-temporal clashes and improve site logistics. We help stakeholders see a clear, data-driven view of how assets are built over time. This supports better decision-making, resource use, and risk management during the project lifecycle.
4D Building Information Modeling (4D BIM) is a process for intelligently linking a 3D BIM model to time or schedule-related data in a common data environment (CDE).

We Provide 4D Construction Scheduling Services Across USA
How 4D BIM scheduling can improve a construction project?
Following are the benefits of 4D Planning and Scheduling:
- Implementation of 4D BIM planning and scheduling in construction adds value to your construction project, eliminating the time-related uncertainties.
- 4D Modeling in construction provides a risk mitigated work environment, as a result of enhanced team collaboration and communication.
- Construction professionals can remotely monitor the progress of their construction projects through 4D BIM simulation.
- 4D scheduling with VDC improves the visualization parameters, giving a clear-cut idea of the project’s timeline to all the stakeholders involved.
- Conflict-free 4D BIM schedule provides a realistic image of the construction project during the pre-bid presentations.
- Scheduling in BIM eliminates the need for last-minute on-site coordination and rework


How to Implement 4D BIM Schedules into Your Project?
To implement 4D BIM planning and simulation in a building construction project, one has to follow the following steps in Revit:
- Create the 3D BIM model of the project
- Create a schedule data of the project using MS Project or Primavera P6
- Divide the 3D BIM model into Levels and Zones to match the schedule
- Integrate the 3D BIM model with the schedule
- Simulate the 4D BIM model with time associations
OUR EXPERTISE IN

Commercial Buildings

Educational Institute

Historic Monuments

Hotels and Resorts

Residential Buildings

Train Stations & Airport
Why outsource 4D BIM to Tejjy Inc.?
At Tejjy Inc. we believe that well designed spaces contribute to the wellbeing of individuals and communities. Our architects, engineers, surveyors, contractors, and BIM modelers create architectural design drawings and 3D BIM models to assist our clients in visualizing their visions.
Our top objective is to provide extremely precise, clash-free construction drawings to ensure a smooth construction process. Implications of 4D BIM scheduling in the construction process have enabled to save cost and labor in numerous projects.
With an honest approach to clients and the professional execution of a broad and diverse collection of projects, we have maintained an integrity-based reputation during our 17+ years in the AEC industry.
Our Projects
FAQ
The cost of 4D BIM scheduling services depends upon the complexity and size of the project. To get a quote for your 4D BIM project, get in touch with us.
4D BIM software named Navisworks Manage combines spatial coordination with construction planning, allowing the simulation and analysis of it, and also you can manage the changes that occur during the construction progress. Other 4D BIM software list includes Synchro 4D, MS Project, and Primavera P6, which can also be used for 4D BIM planning and scheduling.