Building with drones Drone architecture design

Drone Facilitating Building Design Collaboration with BIM

Building with drones Drone architecture design

New technological tools are contributing towards making the construction processes efficient. Currently, drones and BIM technologies are going hand-in-hand for enhancing the AEC business. Tejjy Inc. – one of the top BIM consultants in USA works with drones or flying cameras for several residential and commercial projects. Architectural, engineering and construction professionals use drones for surveying an existing construction, monitoring work progress. Integrating BIM with drones helps to enhance the efficiency of the entire building lifecycle, ushering a revolution in the construction sector.

How Tejjy Inc. works with drones in 4 different phases of building life cycles?

Tejjy Inc. works with BIM-integrated drones, or unmanned aerial vehicles in 4 different phases of the building process.

1. Design phase – In this design-build stage, Tejjy Inc. BIM service providers in USA use drones for surveying the morphology of the land or built-up areas. Based on the concepts of photogrammetry, a series of photographs are captured by the drone and then processed by software applications with technologies like structure from motion or 3d geometry. The technique leads to the formation of point
clouds for creating 3d mesh models. Competent BIM consultants of Tejjy Inc. integrate laser scanning surveys, leading to accurate and comprehensive point clouds. Data collected from drones are used to plan construction activities, thus forming an interesting connection between drones, BIM, and urban planning.

    Your Name (required)

    Your Email (required)

    Phone (required)

    Your Message

    2. Operation Phase

    Often, there are several problems on construction sites that cannot be foreseen or are difficult to manage. Tejjy Inc. BIM engineers use drones for monitoring the evolution of the construction site operations. The photos and videos from drones get uploaded on BIM collaboration platforms for automatic data sharing amongst project stakeholders. Integrated BIM and drone facilitate sharing of aerial shots and high-definition videos in real-time to get full control of the site without actually being present in the place. This prevents accidents as interference amongst different building processes could be avoided in an optimized way.

    3. Facility Management Phase

    As soon as the construction phase gets completed, the facility management phase also undergoes a series of challenges. The long life span of the building makes it difficult to undertake building management and maintenance. Use of drone-integrated BIM modeling the solution enables Tejjy Inc. to update the model for facility maintenance, tracing the exact position of the building element pertaining to the building lifecycle.

    4. Dismantling Phase

    Tejjy Inc. BIM service provider in USA monitors disassembly, demolition and restoration phases of buildings with a drone-integrated BIM model. The in-depth information about a building collected through drones and fed into the BIM model enables project stakeholders to identify materials that need to be disposed of with greater care such as special waste or dangerous substances.

    To obtain a BIM-integrated drone solution, talk to the BIM engineers of Tejjy Inc. at 202-465-4830 or info@tejjy.com.

    why choose us
    • Informed decision-making.
    • Checking accuracy of element placement.
    • Integrating BIM with Virtual Reality (VR).
    • Enhancing safety on construction sites

    Our Expertise In

    Commercial Buildings
    Commercial Buildings
    Educational Institute
    Educational Institute
    Historic Monuments
    Historic Monuments
    Hotels & Resorts
    Hotels & Resorts
    Residential Buildings
    Residential Buildings
    Train Stations & Airport
    Train Stations & Airport

    Why choose BIM & Drone solutions?

    • Using BIM with drones supports informed decision-making throughout the project lifecycle for design and construction.
    • Numerous readings obtained through drones get captured & matched with previous results for ensuring planned project progress.
    • BIM models of construction projects are placed into VR technology, enabling designers to get ‘walk through’ of the building for improved visualization.
    • Drone & BIM ensure workplace safety, endorsing easy access to safety equipment, tracking emergency equipment locations.

    Connect with our Allied Services

    Header
    Header

    BIM Modeling

    Tejjy Inc offers BIM Modeling services for Architectural, Structural, MEP, Facade engineering. Our services include 3d visualization, 4D BIM, Quantity TakeOff, Clash Coordination models, Green Building Environment, Fabrication/Modularization with detailed design drawings .

    Header

    Architectural & Engineering

    We here innovatively create and remodel structures. Facilitating latest interior, landscaping, floor design Tejjy designs residential, commercial building designs. Adopting BIM we execute shop drawings, as built drawings and models.

    Header

    Construction Management

    We facilitate from estimation, bidding, construction documentation to entire construction life cycle management. Adopting 3d visualization, Virtual Reality, Augmented Reality , Drone Risk management along with cost time effectiveness takes the primal focus.

    Header

    Facilities Operation Management

    As a Design Build Firm from Design, operate and execute we maintain the structure too. Our services include engineering diagnostics, MEP support, asset management with 7D BIM. Improving the ROI with efficency is the target of our team.

    Our Projects