Excavation-Checklist-for-Obtaining-SOE-Permit
Permit Expediter

Excavation Checklist for Obtaining SOE Permit

Support of Excavation (SOE) is a provisional earth retaining system planned to control the ground for enabling a safe and effective space for the construction. In certain cases, the SOE System can act as permanent structural support. Now, let’s take a look at the Excavation Checklist that supports obtaining SOE Permit.

To get your SOE permit approval, you must pay heed to the excavation checklist that includes General Job site Inspection, Utilities, Access & Egress, Wet Conditions, Hazardous Atmosphere, and Support System.

Excavation Checklist for Obtaining SOE Permit

General Job site Inspection for SOE Permit Approval:

  • Excavations, adjacent areas protective systems inspected by a capable person every day before the onset of work
  • A competent person who can decide to remove employees from excavation instantly
  • Removal/Support of Surface Impediments
  • Employees threatened from loose rock or soil, posing a menace by falling or rolling into the excavation
  • Hard hats are worn by employees
  • Materials & equipment set back within 2 feet from the verge of the excavation
  • Obstacles provided at remotely located excavations, wells, shafts & pits
  • Walkways & bridges over excavations, which are 4 feet or more in-depth are fortified with typical guardrails & toe boards
  • Warning vests or highly visible clothing provided & worn by employees exposed to public vehicular traffic
  • Employees need to maintain distance from vehicles being loaded or unloaded
  • Warning system established & utilized while mobile equipment is functioning close to the verge of the excavation
  • Employees proscribed from going under suspended loads & prohibited from working on the facets of inclined or benched excavations above other employees

Utilities for SOE Permit:

  • Utility companies communicated and the location of utilities
  • The specific location of the marked utilities
  • Underground installations that are protected, supported, or removed while excavation is open

Access & Egress:

  • Lateral travel to means of egress not more than 25 feet in excavations 4 feet in depth
  • Structural ramps used by employees designed by a competent person
  • Structural ramps used for equipment designed by a registered professional engineer
  • Employees shied from collapses while entering or departing the excavation

Site Location:

  • Date, Time & the Persons Managing the Site
  • Soil Classification with the Depth & Width of Excavation
  • Kind of Protective System Used

Wet Conditions:

  • Precautions for protecting employees from water accumulation
  • Water removal equipment monitored by a competent person
  • Surface water/runoff diverted or controlled to prevent accumulation in the excavation
  • Inspections made after every rainstorm or other hazard increasing occurrence

Checking the Hazardous Atmosphere for SOE Permit:

  • Testing the Atmosphere within the excavation where there is a probability of an oxygen shortage, inflammable or other detrimental contaminant revealing employees to a hazard
  • Adequate precautions for protecting employees exposure an atmosphere encompassing less than 19.5% oxygen other hazardous atmospheres
  • Providing ventilation to prevent employees exposure to an atmosphere containing flammable gas over 10% of the lower explosive limit of the gas
  • Testing conducted to ensure the safety of the atmosphere
  • Emergency equipment like breathing apparatus, safety harness and lifeline and basket stretcher where hazardous atmospheres exist
  • Training employees to use personal protective & other rescue equipment
  • Safety harness lifeline while entering deep confined excavations

Support Systems for Acquiring SOE Permit

  • Materials & equipment for support systems based on soil analysis, trench depth & expected loads
  • Inspecting materials & equipment used for protective systems to see whether they are in good condition
  • Removing materials & equipment if they are not in good conditions
  • Damaged materials equipment used protective systems to be inspected by a registered professional engineer after repairs before placing back into service
  • Installation of protective systems without uncovering staffs to the dangers of collapses or risk of getting obstructed by materials/equipment
  • Members of support system securely attached to prevent failure
  • Ensure that the support systems provide stability to the nearby structures, road & walls
  • Checking the back filling progress with removal of the support system
  • Material excavation to a level not more than 2 feet beneath the bottom of support system only if system is intended to support loads calculated for full depth
  • Placing the shield system to prevent lateral movement

To know more:

If you are stuck with your DCRA building permit in Washington DC, opt for a permit expediting service provider for managing building permit applications for new construction and renovations. Tejjy Inc. facilitates affordable permit expediting services in Washington DC without any delay. Call at 202-465-4830 or send mail at info@tejjy.com for your permit service approval.

DCRA Permit Expediting Services
Permit Expediter

When and Why do you need Building Permits in Washington DC?

Building Permits are all about safety. It’s the enforcing construction standards that provide the building occupants the chance to avoid fire, any kind of structural failures, or a simple thing as a child’s head getting caught between stair posts. The building permits, which are the written authorizations issued by a city or county are essential for most of the construction and remodeling projects, to ensure the safety of the work in compliance with building, construction, and zoning codes.

Permits Services in DC are required for:

  • New Building & Foundations
  • Additions, Modifications, or Restoration of Existing Buildings
  • Demolition
  • Construction of Retaining Walls, Sheds, Fences, Garages
  • Formation of Signs or Awnings
  • Inner Space Design of New & Existing Commercial Buildings (for instance, changing the floor plan of a building from 6 one-bedroom apartments to 3 two-bedroom apartments)

Benefits of Availing Permit Services in DC:

  • Keeps Contractors Honest through the Use of Safe Methods & Materials
  • Guides Project following Modern Building Codes & Practices
  • Retains the Validity of Insurance
  • Values Your Home While Selling

When an Issued Building Permit becomes Invalid?

Your issued building permit will become invalid if the official work has not started within 1 year after the issuance of a permit, or if the official work has beendeferred for one year, after the beginning of the construction work.

What are the Building Permit requirements of a Historic District?

  • Brick Pointing
  • Caulking, Patching & Plaster Repairing of non-rated assemblies
  • Installing Window Screens & Storm Windows
  • Repairing of Fences
  • Painting
  • Tiling & Carpeting
  • Floor Covering, Counter tops & Cabinets

Construction Permits Required for Replacing/Adding/Renovating Items:

  • Roofing &Siding
  • Gutters, Downspouts & Fascia
  • Private Sidewalks & Driveways
  • Patios
  • Suspended ceiling tile
  • Gypsum board excluding the installation of fire-rated gypsum wallboard or shaft liner
  • Garden storage shed
  • Prefabricated pools or accessory to buildings under the jurisdiction of the Residential Code
  • Retaining walls not over 4 feet from the bottom of the footing to the top of the wall
  • Shade cloth structures for nursery or agricultural purposes
  • Swings & other playground equipment accessory to family dwellings
  • Portableequipment, cases, racks, counters &partitions
  • Additional permits like Supplemental Systems Installation (A/C, electric, plumbing)
  • Water or Sewer Excavation (pipe installation & water main connections) 

Public Space Permits:

A public space permit is essential for installing or using structures on public space such as:

  • Dumpsters in Public Space
  • Sidewalk Construction, Repair& Cafes
  • Front Patios
  • Flag Poles, Planter Box, Retaining Walls &Fences

The District Department of Transportationoversees the usage &occupancy ofpublic space permits.

How long does it take to get a building permit in DC?

For a new construction permit, DCRA reports a normal issuance time of 6 months. Commercial new build permits require more than 6 months for the process. However, the situation may not be the same for Washington DC.

How Tejjy Inc. helps in Permit Approval Services in DC?

  • Heath Department Approvals
  • Site Surveys
  • Building Cost Estimation
  • Design Development Drawing Review
  • Sign Permits
  • Term Negotiations with Permit Review Technicians
  • Design Modification for Optimized Cost Efficiency
  • Stop Work Order Removal
  • Permit Timeline Scheduling (Predecessor/Successor)
  • Risk Anticipation & Feasibility Analysis
  • Predicting Required Permits & Authoring Permit Applications
  • Enabling Early Review with Permit Regulators & Expediting Permit Applications

To know more about permit expediting service in Washington DC and resume work avoiding the delays in a construction project, call Tejjy Inc. at 202-465-4830 or mail at info@tejjy.com.