Tag: BIM Execution Planning

IM Design Collaboration | mep clash detection services
BIM Service

9 Reasons Why Cloud BIM Design Collaboration Can Enhance Business Profits?

 

Tejjy Inc- BIM Modeling Design Solution

Connectivity, BIM (Building Information Modeling)techniques, and Cloud BIM Design Collaboration are making a great impact on the design professionals.No longer construction professionals are tied to a desk, studio, or a workspace. Untethered by technologies, enabling easy access to data from anywhere, more AEC professionals are teaming up remotely, from multiple offices of the same firm, or home.

Not necessitating teams on same physical space occupancy. Building design process integrates designer, general contractors, BIM engineers, MEP consultants, subcontractors, architect . A centralized collaboration through Revit Point cloud software works effectively including remote contributors.

Front runners of the Architecture, Engineering and Construction industry are implementing point cloud files in Revit, enabling remote data management. The traditional design build environment centers on actual sharing of information. The information could be tracked & archived in the cloud from 3D model data to project communications through emails and annotations. The team members need to access the information anywhere, on any device. Collaboration occurs among all the project stakeholders including the architecture &engineering firm, their consultants, owners, public agencies & clients.

Each member can contribute to a design build, shared workstation, wherever they are situated. This unlocks the opportunity for collaborative teams to embrace specialists from anywhere in the world. Anywhere & anytime access helps the teams to lessen the need for value-engineering elements at a later phase of the project, as data frictions or clashes can be detected earlier, allowing the team to collaborate on a mutually approved solution earlier in the design process facilitating cost savings.

Benefits of Cloud BIM Design Collaboration for Project Team:

  1. Reduced Project Inaccuracies & Data Friction
  2. Faster Turnaround Time for the Project
  3. Work from Anywhere for Boosting Productivity & Connectivity
  4. Saving on Information Technology
  5. Decreased costs through Virtual Co-locating of Project Teams
  6. Spending Less Time on BIM Clash Coordination & More on Designing
  7. Winning more Project Contract
  8. Enhanced Communication with Extended Project Stakeholders
  9. Retaining Best Talent of the Industry.

BIM Services Provider in USA |Tejjy BIM companies in usa

Reduced Project Inaccuracies & Data Friction:

The goal of all the AEC firms is to reduce the cost of rework during construction project lifecycle. By adopting latest construction techniques 5% to 15% (approx)of the project cost can be eliminated. The basic cost escalates due to inaccuracies in the building design environment. As per the Smart Market Report of McGraw Hill on the “Business Value of BIM in North America”, 57% of the architects survey concluded that best benefit of BIM Building Information Modeling is reduced document inaccuracies. Reduced rework minimizes mistakes and allow clash detection at the early. Autodesk Revit techniques reduce costs and boost earnings.

Nevertheless, in the reality of dispersed teams and joint venture schemes, it could be difficult for the project teams to fully realize BIM benefits. With multiple team members spread across different locations, point cloud collaboration can be the differentiator to help teams obtain the BIM benefits by facilitating the required real-time communication and data sharing.

33% of the AEC professionals consider it to be a challenge for retrieving the latest documents and accessing the most current information in a completed project and 32% are concerned that somebody will use the wrong revision.

 cloud solution having a project communication log & version history tracking, an exact amendment can be flagged to all the project stakeholders and can be updated in the master model where everybody works.

  • Contractors can get the benefits of accessing the model to run clash detections earlier at the pre-construction stage. Identifying a clash costs around 13 times more in the construction phase, compared to the detection of a potential issue at the design phase of a BIM project. Resolving a clash in Building Information Modeling is considerably cheaper than on-site, costing about $90 vs. $110013.

  • Delay & cost overrun in a construction project is often due to the involvement of human error, produced by a shortage of communication and poor project data and documentation management. A human mistake can be reduced to a great extent through a collaborative building design solution, where analysis can be done frequently and accurately. Collaborative BIM minimizes the rework of CAD drawings from 48% to 2%.

Faster Turnaround Time for the Project:

More than 60% of the capital programs fail to meet the cost & schedule targets. Some of the ineffectiveness involved in the traditional project delivery processes entails significant costs and time requirements.

An effective BIM workflow helps to streamline project timelines and lessen overall costs, benefiting all project stakeholders. Building Information Modeling, together with cloud collaboration can save time for a project team throughout the entire building design process.

  • Designers can quickly iterate design elements through evaluating and optimizing building performance, response to client requests, and analyze 4D construction simulations at the early phase of design, editing potential issues earlier in the process.
  • Cloud collaboration facilitates all team members to participate in real-time, whether they are working directly in BIM or approving the consequence of design changes, dramatically accelerating the workflows.
  • With routine design updates communicated to the team through the cloud, personal meetings can be devoted to progressive discussions as opposed to everyday logistics. You can keep the benefits of collaboration, and move the day-to-day into the cloud.

  • BIM 360 Design is a vital communication tool, augmenting the flow of information and facilitating job execution. It has been observed that the turnaround time of the project for the BIM modeling and the construction drawing creation can be reduced by 35% with the use of the BIM 360 Design tool.

Boost Connectivity & Productivity with online working:

The competence to draw on vast amounts of remotely stored data from cloud services, and the proliferation of mobile devices and feature-rich mobile applications, connote that the project team can access all project data from anywhere across the globe. Communication features pushing instant updates to all members working on a project are revolutionizing the BIM procedure to enable communication with project stakeholders who need to be aware of approved project updates in actual time, enabling the extended project team to work collaboratively.

By empowering the project team to stay productive even when they are not together or are separated by distance, profits can be realized that can certainly influence the bottom line. Virtually 4 out of 10 AEC professionals stated that online access to all documents on any device platform is one of the vital factors for enhancing the company’s productivity or decreasing costs.As per the market research, it is found that people want to work from anywhere, necessitating applications optimized for mobile working.

Saving on Information Technology:

Cloud solutions help to get the users up and running quickly and provide manifold benefits over on-premise IT system options taking time to set up. An on-premise system also entails an upfront capital investment and carries operating expenses to cover IT personnel. Workarounds, like using an FTP, leads to heavy traffic on your network, along with duplicate data on servers. Almost 1/3rd of the AEC professionals use manifold software tools throughout a construction or design project causing duplication of data.

Cloud BIM Design Collaboration can be arranged instantly and can be scaled up or down as per the project size and the associated team. Presenting the workspace in the cloud helps to make real-time, synchronized design for the next or the current project.

Building Information Modeling projects operating exclusively on on-premise solutions can face challenges whenever it comes to joint edit, as team members who are not on-site struggle to get the model access. Contractors, architects, and engineers all use their servers, but it should be decided who will host the central model, assuming responsibility for the database, and splitting the associated costs.Poor synchronization of the 3D model across the servers and work spaces may lead to wastage of time and money.

Accessing a model hosted on an on-premise solution is not a good solution for allocating a project owner or stakeholders who don’t work in BIM, and who are not trained for using the software application to comprehend a technical plan. This set up may cause delays to the project feedback. Through a cloud collaboration solution, extended team members can log in and visualize the 3D BIM model in an accessible viewer, enhancing the speed & exactness of their feedback.

Decreased Costs with Virtual Co-locating of Project Teams

A fundamental advantage of BIM is the ability of numerous contributors to concurrently work in the same model. Presenting the shared model in the cloud is one way for enabling virtual cloud BIM work-sharing. Cloud collaboration with mobile access to the shared model gives a critical access point to those within or outside of the Revit BIM Modeling environment.

The physical co-location of project stakeholders essential by clients or public agencies can be very expensive at times. Frequently the travel costs related to the co-location have to be stated up front in the tender process, inferring that the project team can wind up footing the bill with the run over. Businesses need to bestow full-time employees co-located on a project site for the duration of the project. Co-location can necessitate an investment in hardware &IT infrastructure, together with the design & fit-out of the office space for the team members. A digital solution for the virtual co-location, thus, can be an enormous financial benefit to the project as an alternative solution.

Through cloud collaboration, project teams can simulate ‘war rooms’ to let everybody involved in the process – be it the mechanical, electrical, and plumbing engineer (MEP), architect, contractor, and structural engineer – to work through project checkpoints efficiently. This alternative eradicates the necessity to fund physical location, food, & travel for the whole project team.

Spending Less Time on Cloud BIM Design Collaboration & More on Designing

Construction design professionals are most operative while focusing on their area of expertise. Through conventional design, there is a wastage of time by figuring out the way of getting updates into the 3D model or waiting for the latest version of files from other parties. Virtually 1 among 3 AEC professionals state that cloud technology tool scan complete a project on schedule using manifold software applications, causing IT redundancy & wasted staff time.

An actual collaboration environment helps to reduce employee downtime, ensuring that everyone can get access and can work with the latest version of the design. Teams can work effectively, and deliver progressive, award-winning, trend-setting construction while focusing on the design instead of worrying about the updates.

Win more Project Bids

Enhanced collaboration technique is also driving worldwide businesses and the improved internationalization of building design driving additional technology innovation. The commencement of enhanced collaboration processes has made it easy to work with expert associates based anywhere in the world. It is just not feasible to get everybody in the same room regularly if they are spread across the world. This tendency for AEC players to be more universal in their project outlook has compelled the expansion of cloud technology envisioned specially for the purpose. With cloud BIM collaboration, physical location is no longer an obstacle to project participants, no matter where it is located.

Novel collaboration technologies are opening prospects for associates who otherwise may have been too small to participate in projects. Earlier, they could not validate the investment in the IT infrastructure essential to collaborate with larger associates on the model. However, with the low capital expenses of cloud solutions, there is a lesser barrier to entry. Cloud design collaboration acts as an equalizer. Smaller firms can be more competitive as they can access the same high-quality resolutions as their superior competitors on a scale that suits the business growth through bidding on joint ventures with bigger cohorts.

Enhanced Communication with Extended Project Stakeholders

Using conventional communication tools, sharing a 3D BIM model with the building owner & nontechnical stakeholders for review or approval involves a complicated and time-consuming procedure. Through exporting a model as 3D rendering and uploading to an FTP is incompetent. Sending 3D PDF renderings frequently confuses non-designers. This time-consuming procedure often causes versioning issues, resulting in the delay of project approvals or sign-offs.

The poor application of building design data together with the upsurge in an extremely fragmented team costs the US capital facilities industry $15.8 billion per annum, and the owner’s burden is about 2/3rd of those costs during the ongoing processes. Almost 1 among 4 AEC professionals mentioned that the use of multiple technology tools without streamlined integration negatively influences project efficiency.

Through Cloud BIM Design Collaboration the speed of project approval can radically enhance by providing real-time access to the 3D model as it is updated. The building owner can log in and can check the project progress anytime. Cloud sharing eliminates a time-consuming organizational task and helps in enhancing the flow of communication and increasing trust.

Retaining Best Talent of the Industry

Attracting and retaining the best talent or BIM resources makes a real difference in your ability to compete. Working from anywhere is possible and so you can employ the qualified person for a project, instead of being restricted to local resources. Cloud design collaboration is a wonderful way of allowing distributed teams to function consistently, even when they aren’t in the same office.

Top professionals progressively demand positions with companies providing a good work-life balance. In construction design, this gives your team the bandwidth to focus on the actual design, along with the creative and problem-solving challenges and offering flexible working options. They want to spend less time on construction management and categorization through file versions, and more time on design, seeking inspiration out in the field.

Flexible hours may seem less conceivable in an industry with tight deadlines. But with cloud collaboration, project team members can participate from anywhere. This unlocks the doors to the employees, who are underrepresented in the industry. To know more about Cloud BIM Design Collaboration , BIM coordination through BIM 360 design collaboration workflow, consult the BIM Engineers of Tejjy Inc.– a BIM Modeling Company based in Washington DC working with BIM 360 Glue, Autodesk Revit BIM, NavisWorks and other latest software applications at 202-465-4830 or info@tejjy.com.

 

To know more about us :

 

BIM Facility management | 7d bim in usa
Construction Management

What is Facility Management?

 

Asset and BIM Facility Management Company in US Tejjy

Facility Management (FM) is a business, encompassing manifold disciplines to safeguard functionality, comfort, safety, and efficacy of the built set-up by integrating people, place, process & technology. The scope of facilities management is fairly large. While a Sales Manager is accountable for dealing with the performance of sales people, the purpose of BIM Facility Management services extends beyond managing the facilities.

Now, what’s the significance of BIM facility management? To understand the activity of the facility managers, their responsibilities, and their influence on a company, it’s good to analyze their scope of work. The four pillars of facilities management include human resources, procedures, the building, and technology.

Facility managers are also accountable for keeping the facilities moving along smoothly. The job entails day-to-day oversight with the capacity to implement the varying needs of the facility. However, FMs need the farsightedness to involve in facility planning for keeping pace with the demands of the workplace. A forward-looking mindset helps the facility managers to maximize space, enhance the workplace experience, and keep up reduced low. This starts by discerning current trends and identifying the essential workplace requirements.

Who is the Facility Manager?

A facilities manager is responsible for ensuring that the constructions and their services match the requirements of the people working with them. The experienced BIM companies near me facilitates BIM Facility Management services. These BIM companies are responsible for cleaning, security and parking, making the surrounding environment an apt condition to work. Facilities managers are responsible for the security, maintenance, and services of work facilities for ensuring that they meet the requirements of the organization and its work forces. Further, facilities managers look after all services that facilitate business or other organizations do the work. They observe, understand, and act on crucial areas for planning future developments. The objective is to optimize the diverse façades of the business by improving one thing and touching all facilities.

How Facility Management is Creating Efficiency?

Understanding the significance of facility planning entails looking at competence. It depends on the way how effectively you can use the space available to you. Are you catering to employee efficiency? Where does the waste exist in your workstation and what can you do for minimizing it?

The objective of facility planning is to make out opportunities for efficiency and anticipate them. Easing inadequacies within the workplace has rippling effects throughout the entire business.

• Identifying workspace prevents congestion and the dip in efficiency coming with it. This also serves as the basis for a cost-saving hot desk or remote work plan.

• Reviewing vendor contracts enable Facilities Managers to move to an integrated BIM Facility Management services method, consolidating costs, and reshuffling the property management facet of facilities oversight.

• Top BIM modeling companies in USA evaluate tenancy data from an office IoT provides facility managers the required information to anticipate space requirements for a growing workforce, supporting improved planning for expansion of costs & logistics.

Responsibility of Facility Manager:

The four main functions of Facilities Management include:

  1. Supporting People
  2. Establishing Procedures
  3. Maintaining & Improving Facilities
  4. Integrating Technologies

  1. Supporting People:  

Being top BIM service provider  the key objective of a facility manager is to create an accommodating work environment for the employees serving extensive goals, including attracting & retaining talent, improving efficiency, and producing a progressive workplace culture. Facility managers support employees in several ways such as:

  • Synchronizing desk arrangements
  • Supervising employee directories
  • Enabling space utilization
  • Managing emergency planning

Facility managers serve as a bond within the workplace and the employees. Each time problems of accommodation, safety, or comfort crop up, the facility managers help to resolve them. Facility managers are also accountable for providing vital planning data and determining the long-term tactic for optimizing workplaces. Their daily communication with the workstation throws light on accurate costs, providing competitive benefits to the employees.

  • Establishing Procedures:

What are the roles of BIM facility management without a method of governing them? Establishing procedure fetches order to the workplace. Order produces a method of expectations, positively impacting the utilization of the workplace. The workstation operates on various practices, including:

  • Submitting a Request of Work Order
  • Space Reservation within the facility
  • Checking Guests & Visitors
  • Preparing an Emergency Action Plan

  • Maintaining & Improving Facilities

Best facility and operation management BIM companies is mostly rooted in the maintenance and improvement of the facilities. It encompasses future planning, asset management, and undertaking a wide array of responsibilities including:

  • Detecting & Maintaining Vendor Contracts
  • Repairing, Maintenance & Building Improvement
  • Cleaning & Decoration of the Work Place
  • On-site & off-site Property Management

  • Integrating Technologies

A competent facility manager should understand the right usage of technology. Workplace management systems collect data, driving vital decisions about executing the business, and shaping the workplace. Detecting and adopting the right technology is one of the prime responsibilities of facility managers. They should know the use and the process of leveraging technology like:

  • Exploring IoT strategies as per the data collection requirement
  • Integrating IoT devices into day-to-day facilities procedures
  • Assessing the cost, ROI, and benefit of smart technologies
  • Using aggregated data to comprehend the workplace in an improved manner

How to become a Facility Manager?

To become a facility manager, one has to acquire certifications with a blend of education and experience. The CFM (Certified Facility Manager) certification has certain eligibility requirements like a Master’s or Bachelor’s degree in Facility Management.

Relationship between BIM & Facility Management:

BIM (Building Information Modeling) is beneficial in existing facilities, which are not created using an integrated, 3D digital model. Through the usage of innovative design plans and laser scanning technology, the Building Information Model can be produced from a prevailing facility. The system can then be utilized for monitoring & standardizing systems and recommending retrofit opportunities for operational efficacy & cost-savings. All ongoing benefits of a BIM platform are accessible to the building owners and managers. The ability to trace contracts & performance over the extended period of the facility is priceless. It becomes easier to analyze the contracts and ensure fulfillment through an integrated BIM Model.

BIM is characteristically used in association with cloud architecture. This method allows contractors and participants to access and review building information remotely, increasing the collaborative potential and productivity gains.

Role of BIM in Facilities Management:

While the value proposition throughout the initial stages of design & construction is noteworthy and can be gauged directly in ROI, other benefits of this methodology on the facility’s usefulness include:

  • Improvement in the facility designs for occupants’ comfort & safety for office or residential facilities through:
  • Creation of security concerns & evacuation plans in an intuitive way to promote the health & well-being of the occupants.
  • Detection of radio frequency interrogators & smart planning negating security flaws on a facility with the low negative impact on comfort & ease of access for the inhabitants.
  • Improvement in manufacturing plants, through enhanced efficiency through:
  • 3D BIM Modeling & Control of the manufacturing process by designing the most efficient assembly line possible
  • Accomplishing product modeling, analyzing off-site processes, and testing digitally before implementation, with huge potential savings.

BIM for Smart Buildings:

  • BIM (Building Information Modeling) is efficiently used in tandem with the smart building process, involving the dynamic integration of building & information systems. This helps in automatic clash detection, responding to environmental changes through using wireless sensors entrenched in the exterior & interior surfaces.
  • Sensors can identify and respond to daylight levels, outdoor temperatures, systems performance & conceivable deterioration, and mechanically correct window tint, blind positioning, and HVAC settings along with alert facilities workforces to any incongruities.
  • The systems can anticipate conditions to respond on time. Through synchronizing integrated intelligent building systems with BIM, you can get a complete depiction of a building’s status in real-time.

Using best BIM companies for smart building technology helps civil engineers to provide cost-savings through the building’s life cycle for making it a pleasant & desirable place to live. Building planning & construction in a multi-disciplinary industry has integrated information & collaborative communication between contractors & owners. 3D digital model stored in the cloud resolves all the problems, paving the way for increased usage in the future.

To know more about BIM facility management services, call the BIM Engineers of Tejjy Inc. at 202-465-4830 or info@tejjy.com to discuss your project ideas.

To Know more about us:

Tejjy Best BIM Modeling Companies usa
3D Modeling Services

Benefits of 2D | 3D | 4D | 5D | 6D BIM Modeling – When to Opt Which BIM Services?

Best BIM Modeling Companies in usa -3D BIM | 4D Scheduling |Quantity Takeoff

Today, BIM revolution is quite popular in the construction industry. Nevertheless, Which of 2D, 3D, 4D, 5D & 6D BIM dimensions are well-suitable is the most difficult question for some people to understand. BIM (Building Information Modeling) dimensions and BIM LOD(level of detailing) denote a specific way in which diverse data are related to an information model for accurate excecution in project life cycle.

What is BIM Building Information Modeling?

This digitized technique sounds exciting . But , dimensions and LOD have nothing to do with space, time, black holes, or anything out of an ‘Interstellar’ movie. To be more precise, the dimensions deal with the levels of information in a given BIM data. Building Information Modeling is a digitized model based process with tools, techniques for effective planning , designing, management and execution in project life cycle. BIM has the ability to facilitate architecture, engineering and construction sector. 

Are BIM dimensions different from BIM LOD ? Another, query that boggles your mind. Definitely they are different. Dimensions in 3D Model add different parameters like cost, time, visualization whereas Level of Detailing defines the level of refinement in 3D geometry model service. Leveling up on the dimensions provides architecture, engineering and construction professionals an improved understanding of the construction model, providing information and details such as how, when, and for how much.

Are 2D Draftings | Drawings helpful?

The technique starts with a 2D CAD design drawings dimension, where the models require an X-axis & Y-axis, which gets created through hand or CAD drawings. CAD (Computer-Aided Design drafting) softwares like AutoCAD, AutoCAD LT by Autodesk are adopted for technical design drawings. Design drafters generate floor plans, permit drawings, landscaping, building inspection plans through these technical drawings. The journey from 2D to BIM enables better visualization, walkthrough improving the building designs 

3D BIM Modeling

3rd dimension of Building Information Modeling is a shared informational model, which adds an added “Z-axis” to the existing X & Y-axis. BIM tools and techniques enable creation of  information model for entire project life cycle.is the most popular form of BIM or the concept that most people are acquainted with. It is the technique of producing graphical & non-graphical information and sharing that in the common data environment, broadly called CDE. 3D facilitates AEC stakeholders to manage their multidisciplinary collaboration effectively in modeling & evaluating complex structural problems. Moreover, they can collect accurate data throughout the construction project life cycle and store that in the Building Information Model, adding new values to predictive models and resolving issues proactively.

Why Should You Opt 4D BIM?

The level of 4D BIM is a 3D model with the element of time added to it. The fourth dimension of Building Information Modeling includes additional information to the project and information model in the form of data scheduling. The data gets added to the modules made by the AEC professionals as the project progresses.

Choosing  4D dimensional BIM leads to improved clash detection even referred as clash free construction scheduling. This eliminates the intricacies of the changes occurring throughout the building project . The building information or information model with 4D BIM can be used for getting accurate program visualizations, demonstrating the sequential development of the project. 4D Building Information Modeling provides the right tactics for construction management with optimal resource utilization. The envisaging site status information, change impacts, and backing up communication in numerous situations like informing site staff or notifying them about potential threats.

Reason To Consider 5D BIM Modeling

5D Building Information Modeling adopts a simple 3D geometry and applies the element of cost to the project. This enables better design estimation of cost and materials with BOQ/BOM(Bills of Quantities/Bills of Material). A faster and accurate Quantity takeoff is possible even with any level of design modifications.

Owing to the involvement of the surveyors and estimators from the beginning of the project, BIM modelers along with the design teams have consistent information due to the possibility of cloud-computing. Point-cloud computing even make the conversion to BIM easy .

Associating 5D with a conventional method, where the cost reports aren’t updated frequently and only for a few times during the early stages of the project, can lead to several modifications in designs and material requirements. Implementing Building Information Modeling , the cost estimators can work precisely with cost and time factor in a multi-discplinary platform with design collaboration.

BIM Modeling Companies in USA

Who needs 6D BIM?

Looking for operation and facilities maintenance with asset and facility management cost? The 6D BIM process is also popular as the ‘project life cycle information.’ The technique is often called Facilities Management. Whenever a designer creates a model and updates it through the construction phase, the model acquires the capacity to become an ‘as-built’ model, for turning over to the owner. The as-built model contains all specifications, operation, and maintenance manuals as well as warranty information, suitable for future maintenance. Eradication of making O&M manual out-of-place or keeping it at a remote place facilitates the adoption of IOT-based data driven scheduing.

BIM software like BIM 360 entails capturing of data, where appropriate data is documented throughout the operation of a building. This process in turn aids BIM model to be used for assessing its energy efficacy, monitoring a building’s life cycle cost, and augmenting its cost-efficiency. 6D BIM not only helps in site safety,  with improved productivity but also helping in perfect decision making. This also empowers the owner to gauge the cost of any proposed upgrades.

 

What is ahead of BIM?

The digitization revolutionizing construction, architecture and engineering industry is beyond the expectation. But choosing BIM for small business or large businesses is evidentally beneficial. As Building Information Modeling techniques allows improved planning, designing, managing and constructing smart buildings for commercial , residential, healthcare, hospital, government sector. So why to be scared to adopt BIM Modeling? Choose the Best Experienced BIM Consulting Companies Near …and build designs with difference.

To know about BIM Future scenario for architecture, engineering and construction..Click Here..
BIM Building Information Modeling Service Providers in USA

 




     

     

    Benefit of BIM services for construction manager
    BIM Service

    Role of a Competent BIM Manager for Reaping Full-Fledged BIM Benefits

    It is important to understand the work of a competent BIM manager. Professional design firms & construction sub-contractors can use BIM software application only if it can be managed efficiently. If Building Information Modeling is used properly, projects can be executed properly with the minimized error. However, if it is not managed in the right manner, the project team members will be stuck in a nightmare of monotonous tasks,  repetitive work, and redundant effort. This will subsequently result in missed deadlines, documentation errors, and dissatisfied clients.

    Role of a Competent BIM Manager for Reaping Full-Fledged BIM Benefits

    Let’s explore the role of a Competent BIM Manager:

    Activities in BIM Domain:

    • Manages technical teams & provides necessary project support
    • Assists construction project directors on technical delivery
    • Develops & manages BIM standards, protocols & templates
    • Consults with IT teams, systems administrators, clients & contractors
    • Provides BIM training to the junior members of the team

    Comprehensive Understanding of BIM:

    • Treats BIM model as a realistic depiction of the building
    • Leverages BIM models as a collaborative tool among the modelers, and the receivers of the model output
    • Recognizes BIM models to be a creation of a team of people, and not as an individual task

    Team Configuration for Leveraging BIM

    • Ensures that none works in a silo
    • Sets the team roles as per responsibility and not as per tasks
    • Enforces people to take project ownership, making them responsible for complete work (for instance a person accountable for modeling walls also has to take the responsibility for wall tagging, details & schedules)

    Realistic Approach to BIM Workforce

    • Customizes work practices to the abilities of the people working
      (Should not make someone responsible for facades if they struggle with simple tasks of wall creation)
    • Shouldn’t let designers use specific architectural software if it makes their task of designing, less effective
      (Getting designers to provide hand-drawn sketches to the modeling experts is usually more effective than getting the designers to model properly)
    • Never think that training is merely the solution

    Flexible Working Methodology

    • Retains a flexible workflow for accommodating unusual condition & innovative work practices
    • Never enforce a “universal standards”, which is imperfect, as it is hard to forecast every possible permutation of what needs to be created on every project
    • Supports various work practices based on the intricacy of the project and the ability of the staff working on it

    Involvement in Real BIM Projects

    • Maintains an intimate knowledge of how the BIM office operates through active project engagement
    • Engages in setting up of every project in the office
    • Audits projects periodically
    • Steps in whenever required to assist others but not work full time on a single project

    Capability to Question Specific Requests instead of Reacting

    • Evaluates a request against the real-world consequence, it is trying to achieve
    • Delivers a workflow & work methodology based solution& not just technical solutions
    • Gauges how long a request takes to provide the result
    • Suggests alternatives for obtaining the same consequence

    Proactivity with BIM

    • Uses new BIM software functionality for augmenting problem-solving & service delivery methodologies
    • Provides courageous advice, but accepts that their views may not always be implemented
    • Listens to other project team members who may provide improved ideas
    • Involves themselves in industry-wide BIM concerns


    Unfortunately, all AEC firms don’t understand the need to hire a competent BIM manager, nor do they understand the benefits that a competent BIM manager can bring. Often a graduate who has used BIM software in his course is bestowed the responsibility of a BIM manager. It’s no doubt that these people can become good BIM managers in due course of time with experience. However, if they don’t have any understanding of the profession they will not be able to work in the core BIM areas. All AEC professionals need to understand the fact that the benefits of BIM don’t occur by themselves. Just like any other process, Building Information Modeling should be rightly managed and implemented. It is only then that the project stakeholders can reap the benefits of BIM.

    Appoint a skilled BIM Manager from Tejjy Inc.– a BIM, Engineering, Construction Management, Permit Expedition & Architectural Services Company in DC, VA, MD & Baltimore areas in the USA and step into the world of intelligence working. To know more, call at 202-465-4830 or info@tejjy.com.

    Architectural-BIM-Services-for-Construction-Project-Lifecycle
    Construction Management

    Architectural BIM Services for Construction Project Lifecycle

    Architectural BIM Services for Construction Project Lifecycle

    Architects are the connoisseurs who bring life to the concept of a construction project. They constitute being a vital part of architectural project planning and execution. BIM Service companies act as a support to architects and engineers in their design development process. Architectural Revit Services is a great mode of this collaborative and innovative solution. 3D BIM models use inputs, such as the construction & design documents as well as hand sketches. The team of BIM professionals creates the final model after resolving potential construction problems through raising RFIs (Request for Information) and checking with architects and other project consultants.

    How BIM facilitates Architects in Design Development?

    BIM supports architects in the various stages of design development through conceptual, schematic & detailed designs, as well as construction documentation with the help of 3D Modeling. Architects are able to create the interior design for the renovation and new building creation. BIM also provides virtual mock-ups of building components and creates a comprehensive 360-degree view of the projected building. 

    BIM Supporting Various Stages of Construction Project Lifecycle

    • Conceptual Designing: Architectural BIM Modeling provides an edge to the whole design process. BIM is used for creating manifold design routes for presentation with variations in layout and space planning. 3D Rendering Services Models with diverse colors and material specifications provide a realistic feel to the virtual building structure. During the concept designing stage, the design of the projected building structure is created using Revit Models, focussing on the looks, behaviors, and structural properties. The stage can be related to the Revit LOD 100 Model including numerous elements as Masses, Conceptual Design & overall project phasing. Location & Orientation analysis can be executed at this stage and quantities based on overall area & volume can also be obtained.

    • Pre-Construction Phase: BIM experts can develop detailed and accurate Construction Drawing Services from Architectural 3D Model. The Revit parametric features presented in a BIM Model facilitates in accomplishing a high level of detailing with precision. Changes made in the plans automatically get reflected in all the associated areas of the sheets. 3D Model for BIM Coordination Services can then be used collaboratively, detecting the clashes before construction. This controls the construction cost by reducing design changes at the time of construction.

    • Construction Phase4D BIM Construction Sequencing and 5D BIM Costing facilitate the planning of the construction phase effectively, enabling on-site coordination with the aid of Architectural BIM Modeling. On-site changes can also be fixed as per the virtual BIM design model. The construction design stage acts as a bridge between building design and physical building stages, encompassing the creation of drawings & specifications for the comprehensive requirements of a building project. The stage matches with LOD 400 Revit Model, comprising elements that are accurate in shape, size, location, quantity & orientation with complete fabrication, assembly, and detailed information.

    • Post Construction Phase: Architectural Modeling Services also help during the post-construction phase for presenting an as-built model that can be used later for the renovation and reconstruction of a building. BIM ensures methodical facility management using a comprehensive Architectural model encompassing various asset details.

    Prime Architectural BIM Services include:

    • BIM Consulting Services for seamless BIM applications
    • LOD Based BIM from a conceptual stage to a well-defined Facility Management model
    • Construction Documentation set of sequential drawings for construction management
    • BIM Design Development of BIM design build services
    • Custom Revit Family Creation Services for all building products
    • Point Cloud to BIM for renovation, retrofitting & as-built projects
    • Landscape BIM Models for creating & coordinating Landscape data
    • Underground Modeling  for improved visualization & clash detection
    • Architectural 3D Modeling to facilitate the design, planning & visualization
    • Procurement BIM through openly shared project models for lucrative project procurement
    • Architectural Detailing for transforming design into technical diagrams & plans
    • 4D Scheduling with data-rich 4D BIM models for early detection & resolution of conflicts
    • Infrastructure BIM Modeling to make civil projects resilient & productive
    • Modular BIM for prefabrication & modular building projects
    • Facility Management BIM to create, utilize & manage building information throughout the lifecycle of the structure
    • BIM for Energy Analysis with virtual 3D energy models

    Architectural Detailing Services across the Sectors:

    Residential, Hospital & Commercial Buildings:

    • Architectural Layouts & Floor Plans
    • Elevations & Sections
    • Door-window Details
    • Sanitation & Piping Plans
    • As-Built Drawings
    • Architectural Elevations & Sections
    • Ceiling & Foundation Plans
    Interior Decorations
    • Floor & Roof Framing Plans
    • Building Sections
    • Interior & Exterior Designs & Plans
    • Furniture Layouts
    Urban Planning
    • Building Block Detailing or Drafting
    • Landscape Drafting with BIM
    • Contour Mapping
    • Drawing development
    • Site Plan Drawings

    BIM software applications used for Architects

    • AutoCAD
    • 3DS Max
    • Photoshop
    • Illustrator
    • SketchUp
    • Revit Software Suite
    • MicroStation
    • Navisworks
    • Bluebeam
    • Civil 3D
    • BIM 360 Glue

    To know more about Architectural BIM services in Washington DC, Baltimore, MD & Virginia areas in the USA consult the BIM experts of Tejjy Inc. at 202-465-4850 or info@tejjy.com.

    BIM-Design-Build-Solutions-for-Architects-Structural-Engineers-MEP-Firms
    3D Modeling Services

    BIM Design-Build Solutions for Architects, Structural Engineers & MEP Firms

    Structural engineering service

    Design build firms provide manifold advantages compared to other construction methodologies. The key benefits of BIM enabled design build services include fast project delivery, smooth construction workflow, improved construction solutions & effective engineering workflow. BIM services enhance communication amongst team members. BIM consulting companies interact with MEP engineering firms and structural engineers for understanding their detailed design intent to deliver value-added support at each stage. Starting from schematic to final construction stage BIM benefits never fail.

    Key Benefits of BIM Enabled Design Build Services

    BIM enabled design build firms provide fast project delivery as design & construction occur concurrently and there’s just one phase instead of two. All project stakeholders collaborate in a coordinated Revit BIM model to get the right balance between practicality and functionality of building design for architects, mep consultants and structural engineers.

    • Clash Coordination Drawings: Collaboration and coordination are firm roots of BIM services. This is held strongly by the 3D BIM Model. Clash coordinated drawings produced from the 3d bim model help to reduce conflicts in the building systems. Accurate mep drawings facilitate the contractors, architects, MEP design firms and the Structural engineers to have accurate design detailing and improved construction. Owners get all information about the project life cycle through the BIM model and thus can pave the way for a smooth construction workflow with comprehensive mechanical drawing services.
    • Improved Construction Services & Value Engineering: In a design build project, as ideas come to the table, the project team works in collaboration for analyzing projects and ensures that the owners receive the best materials, design and planned project schedule. This revolutionary technique makes it feasible for the structural engineers, architects, mep engineering firms and construction project owners to perceive more opportunities and make value-added decisions. Improved mechanical drawing services add value to the engineering design plan, enabling the facility to operate efficiently, evaluating project pros and cons at the pre-construction.
    • Enhanced Scheduling: 4d scheduling facilitates in communicating amongst various team members of the project. Delivering an effective design build project necessitates open collaboration amongst all project stakeholders. A team-oriented method endorses high levels of communication and transparency, vital to the success of any project. This facilitates building owners to share their vision with the team, and align the interests of the project stakeholders. The team-oriented tactic also brings the collaborative effort necessary for evaluating the project objectives, assessing schedules, and analyzing opportunities with the project evolutions. With the help of BIM design build services, all project team stakeholders stay on the same page as everybody works under one contract. Owners stay updated by a set of contacts from the design builder. Hence, through 4d construction simulation, complex projects get visualized at pre-construction, enabling the owners to get improved quality, involving fewer claims and litigation free construction.
    • Customized Revit Family for client centric services: As every building is unique, so are the Revit mep components. To fulfil every client’s requirement, customized Revit family is adopted. Revit BIM services allow AEC professionals, like the architects, structural engineers, and MEP firms to communicate design objectives, investigate building performance and assess cost estimation during the pre-construction stage. Parametric Revit family creation helps to easily capture, evaluate designs and maintain building data throughout the project. To create Revit family, building components are engineered with associated parameters. The Revit families enable clients to get customized content for architectural, structural steel detailing and mep services. Parametric family creation in Revit helps to maintain the right balance between practicality and functionality. BIM consultants ensure that the Revit components are created intelligently, encompassing real life product information or performance mockups for undertaking 4D construction simulations and 5d calculation analysis.
    • Cost Estimation: Top BIM consulting companies help estimators and surveyors in cost and material estimation. Building residential or commercial structures also help to reduce construction costs for the building owners. Smart building with design build solution pays dividends, decreasing real and opportunity costs. Owing to the smooth nature of design build services, project owners reduce the time spent on managing a construction. 5D estimation or BIM quantity takeoff/Bill of Materials/BOQ enable precise cost estimation of building design. Hence, there are improved cost estimates, accurate quantity takeoff, programmed quantity extraction as per design changes and cloud cost data access from anywhere across the globe.

    Stages of BIM Design Build Services for Architects, Structural Engineers & MEP Firms:

    • Schematic Design: Schematic design is the prime design scheme. MEP consultants, MEP coordinators, and residential design build firms define the overall project scope, including the relationship among various building systems. During this stage, they integrate ideas and concepts about what a proposed system should look like. At this stage, the architectural, structural and mep BIM modeling services provide an overall idea of the area, height, volume & location for working on project phasing and cost estimation.
    • Comprehensive Design: Detailed design is a phase subsequent to the schematic design, where resolutions of the schematic design phase are executed in a detailed way in the Revit BIM model. In comprehensive designing AEC clients get drafted to-scale drawings, demonstrating how building structure would appear once the construction is over. The model created by the design build firms helps in creating traditional construction documents and shop drawings for clash coordination analysis and costs.
    • Construction Documentation: Construction documentation is the ultimate phase of the design evolution. During this stage, the models of various building systems are coordinated on a common data environment. Construction documents with coordination drawings act as the bridge between building design and the physical building form. The model includes elements which are appropriate in terms of size, location, shape, quantity and alignment with detailed information about fabrication and assembly.

     How to choose the right design build firm near me?

    Now, the question is how to choose the top design build firm near me?

    • Identify the strength of the design build firm, by evaluating its accountability to all project stakeholders.
    • Check out how the feedback or reviews of design build consulting companies. 
    • Take a look at the completed Revit BIM service projects managed by the building firms along with their record of stability in the market.

    To further explore the design build solutions with architectural, mep and structural engineering service, navigate the process of design build services with the top BIM engineering company. Consult one of the best BIM service providers in USA – Tejjy Inc. at 202-465-4830 or info@tejjy.com and reduce all knowledge gaps between design and construction.

    BIM Service

    How to Seek the Right Firm for Outsourcing BIM Resources?

    Several companies outsource BIM management, working with Building Information Modeling experts for addressing in-house needs. However, that approach may not be apt for every firm. BIM resource sharing management is a complicated task, dealing with support and maintenance of system, successful deployment, training, and standards. 

    BIM Resource Sharing

    Management of BIM resource sharing demands a blending of skills and experience, with technical support, project guidance, design, engineering, and construction expertise.

    Check out whether a BIM company abides by the following aspects:

    Tips/Steps for BIM resource sharing:

    • Creates & Nurtures BIM vision: 

    Find out that the BIM Company you are choosing can deliver an insightful 3D BIM Modeling solution throughout the project development life cycle. The BIM experts should be able to create and nurture the right BIM vision for you and collaboratively execute projects, allowing better understanding with reduced errors and higher accuracy.

    • Chooses, Implements & Maintains BIM Software 

    Select the BIM company who values client requirement and can systematically deal with complex projects with high level of precision implementing various software applications like Autodesk Revit, 3DS Max, Navisworks, BIM 360 Glue, AutoCAD Plant 3D, Tekla, Autodesk AutoCAD, Solidworks, Autodesk Fusion 360, Inventor, Sketchup, Rhinoceros, Creo, Solid Edge and more.

    • Adopts New Technologies to Support BIM Projects

    Hire the BIM Company that executes projects in an integrated way, encompassing collaboration of technology and advanced construction techniques. The BIM service provider should undertake continuous analysis before adopting and embedding technology in a particular phase of the project. The latest technology integration with the Drone, Virtual Reality, 3D Printer, and GEO BIM can help to improve the final project outcome with quality, cost and time efficiency.

    • Embraces 3D Laser Scanning, Energy Analysis, Prefabrication & Cloud Collaboration

    Opt for the company that embraces 3D Laser Scanning technology in BIM Modeling using point cloud data. This will help to make decisions about wanted or unwanted components and structures of the building. Scan to BIM also helps in creating a simulation analysis at an initial stage of feasibility assessment. Ensure that the company can also conduct Energy Analysis with 6D BIM facilitating optimizing energy consumption and sustainability. An ideal BIM Company should also be adept in implementing prefabrication and modularization techniques for construction clients and contractors to improve construction programs. It is also important that the BIM Company you are choosing should have the proficiency with BIM 360 document management software that integrates mobile technology with cloud collaboration for construction management on site.

    • Trains & Evaluates BIM Staff

    Your BIM professionals should be adept at creating a BIM strategy, combining existing workflow with BIM procedures. The BIM strategy must be designed focusing on the tangible as well as the intangible staff training requirements. The company must have the competency to identify useful mechanisms in an existing system and retain them in the new work process. BIM specialists should provide training and recommendations to you.

     • Supports Marketing of BIM services

     It’s also significant to check out whether the BIM Company helps the construction professionals to secure bids through marketing presentations of 3D rendered images, 4D phasing and walkthrough animations.  Appoint the service provider who can make innovative use of BIM for presenting a valid representation of the project, helping you to win competitive bids.

    Check out the following parameters in a BIM Company to ensure consistency across project lifecycle and collaboration among project team members.