Context and objectives
The main responsibilities are: –
- To create 3D models in various disciplines such as HVAC, refrigeration, piping, fire protection, electrical and plumbing.
- To prepare coordinated drawings and model.
- To prepare fabrication shop drawings.
- Project duration: – 3 months.
- Level Of Detail: – 350.
Realizations
- Shop drawing for permit.
- HVAC, piping, plumbing, electrical, refrigeration and fire protection design.
- Coordination Drawing (LOD 350)
- BIM Coordination.
- Clash detection.
- Project Standardization.